The build
Seven stages.
One crew the whole way.
- 01
Grading
We cut the pad into the ridge, test the soil and pin the hillside before anything goes up.
Months 1 to 2 - 02
Foundations
Caissons drilled to bedrock and a post-tensioned slab, poured in one day.
Months 2 to 4 - 03
Structure
Steel and concrete cantilevers, craned in and set so the house floats over the slope.
Months 4 to 8 - 04
Glass
Floor to ceiling panels up to fourteen feet tall, set by hand.
Months 8 to 10 - 05
Pool
A vanishing edge, cantilevered off the hill, lined in dark stone so it holds the sky.
Months 10 to 13 - 06
Landscape
Mature olives and palms craned in, travertine terraces, planting that needs almost no water.
Months 13 to 16 - 07
Lights on
Lighting, smart systems and a full walkthrough at dusk, when the house is meant to be seen.
Months 16 to 18


- Lot
- 0.8 acre, 38° slope
- House
- 9,400 sq ft, 5 bed, 7 bath
- Pool
- 75 ft vanishing edge
- View
- Downtown to the ocean
“The steeper the lot, the better the view. We just do the hard part first.”
Ridgeline, since 2009